How Long Does V4 Broadband Installation Take? | V4 Consumer
Text says ‘How long does installation take?’ with a line icon of a stopwatch, representing time efficiency and speed.

Getting your home connected to V4 Consumer’s fibre network is a straightforward process, but here’s what you can expect in terms of timing:

Installation Day: Up to 2 Hours

  • Engineer Visit:
    On the day of your installation, our engineer will need up to 2 hours to complete the connection inside your home.
    This includes setting up the fibre optic cable, installing the necessary equipment, and ensuring everything is working smoothly.

Bringing Fibre to Your Property: Up to 14 Days

  • Fibre Cable Installation:
    Before the installation inside your home, it may take up to 14 days for our team to bring the fibre cable to your property.
    This process involves running the fibre optic line from the nearest network point to your premises.
  • Availability:
    You typically do not need to be present while we bring the fibre cable to your property.
    However, in some cases, we may need your permission to access the area outside your premises, particularly if there are access restrictions.

By keeping these timelines in mind, you can plan accordingly and look forward to enjoying your new super-fast broadband with minimal hassle.

If you have any concerns or questions, our Customer Care Team is always here to help.

Fill in Your Details

We’ll call at your preferred time
12 + 1 = ?
×
Support-Hours

Monday-Friday

9AM-6PM

Saturday

9AM-2PM

Sunday

Closed

Festive & Bank Holiday-Support-Hours

Wednesday-24th Dec

9AM-2PM

Thursday-25th Dec

Closed

Friday-26th Dec

9AM-6PM

Saturday-27th Dec

9AM-2PM

Sunday-28th Dec

Closed

Tuesday-30th Dec

9AM-6PM

Tuesday-30th Dec

9AM-6PM

Wednesday-31st Dec

9AM-2PM

Thursday-1st Dec

Closed

Friday-2nd January

9AM-6PM